Graphics Version
Logo

Homepage > ... > Traffic Engineering > Traffic Operations > Future Traffic Signals

Future Traffic Signals


Future Traffic Signals and their anticipated completion dates:

City Installed (by date)

  • Lincoln St. / Oak St. - New Signal (2013-2014)
  • Grant St. / Oak St. - New Signal (2013-2014)
  • Blue Oaks Bl. / Foothills Bl. - Signal Modification (Fall 2013 - Fall 2014)
  • Blue Oaks Bl. / New Meadow Dr.  - Signal Modification (Fall 2013 - Fall 2014)
  • Blue Oaks Bl. / Woodcreek Oaks Bl. - Signal Modification (Fall 2013 - Fall 2014)
  • Blue Oaks Bl. / Diamond Creek Bl. - Signal Modification (Fall 2013 - Fall 2014)
  • Blue Oaks Bl. / Diamond Creek Bl. - Signal Modification (Fall 2013 - Fall 2014)
  • Blue Oaks Bl. / Crocker Ranch Rd. - Signal Modification (Fall 2013 - Fall 2014)

Developer Installed (by date)

  • Foothills Bl. / HP Southern Driveway - Signal Modification (Fall 2013)

Public Works - Engineering
Traffic Engineering
311 Vernon Street
(916) 746-1300
(916) 746-1339 Fax
(916) 774-5220 TDD
trafficsignals@roseville.ca.us


SEARCH   

Homepage | Residents | Business | Visiting | Departments | e-Services | Apply | Find | Report | Sign Up
City of Roseville 311 Vernon St., Roseville, CA 95678. Phone: 916-774-5200.
Powered by Civica Software