Road Work, Closures & Detours

Here you'll find the latest information regarding road construction that may affect traffic within city limits and on the freeways around Roseville.

If you commute in and around Roseville, check out the Traveler Information webpage to view real-time information on traffic flow, including video at intersections. 

View planned street closures specific to Downtown Roseville area.

Note: Construction timelines are an estimate only; states of completion vary and can be impacted by unforeseen circumstances. Drivers may encounter other roadway closures and detours within the city that are not listed below.

Follow Roseville Traffic on Twitter.

Learn more about the status of roadway, drainage and bike trail projects

Traffic signals and crosswalks being added at two intersections
News ImageThe City of Roseville is installing new traffic signals and crosswalks at the intersections of Fiddyment Rd., Angus Rd., and Parkland Way, as well as at Secret Ravine Pkwy. and Alexandra Dr. to account for increasing vehicle and pedestrian traffic through the areas. Construction is scheduled to start mid-September.

New downtown construction not expected to impact traffic flow
News ImageAt their meeting September 2, the Roseville City Council approved the construction contract for a new city office building at 316 Vernon Street replacing the existing City Hall Annex building.

The construction schedule is aggressive. The City has an agreement with Sierra College to lease a floor of the building to be ready for their semester classes beginning January 2017.

We expect to keep all streets open around the site during construction, with some short intermittent closures during the delivery of building materials.

Roseville Aquatics Complex overflow parking lot construction begins
The City of Roseville is constructing an asphalt parking lot where the existing Roseville Aquatics Complex overflow gravel parking lot is located, at the corner of McAnally and Woodcreek Oaks. Construction has begun and will last through October. Work hours will be weekdays, 8 a.m. to 5 p.m. Work will be avoided in the road and intersection during student arrival and departure times to prevent traffic impacts.

Residential street resurfacing for parts of west Roseville
News ImageUpdated 9/15: Resurfacing is scheduled to begin August 10 for residential streets in the Foothills/Junction, Woodcreek Oaks, West Park, and Fiddyment Farm neighborhoods. Maintenance in these areas is necessary to guard against the need for major, more costly, street repairs in the future. Please note: residents will always be provided access in and out of neighborhoods.

Construction underway at Lincoln Street and Linda Drive on bike trail segment and grading future fire station site
News ImageConstruction began June 1 on grading the future site for a relocated Fire Station No. 1 at Lincoln Street and Linda Drive, and a segment of the Miner's Ravine Trail under the Lincoln Street bridge. Consistent with the Downtown Specific Plan, the project includes converting Linda Drive to a one-way street adjacent to the future fire station. During construction, the narrowing of Linda Drive will extend from Jefferson Street to Lincoln Street. Construction on the project is expected through December 2015.

View Archive


Homepage | Residents | Business | Visiting | Departments | e-Services | Apply | Find | Report | Sign Up
City of Roseville 311 Vernon St., Roseville, CA 95678. Phone: 916-774-5200.
Powered by Civica Software