Traffic Forms


Before submitting one of the following forms, please review the Traffic Frequently Asked Questions (FAQ) page.

Submit forms to the address at the right.

Forms

Traffic Studies

Traffic Study Request Form

Traffic Operations

Traffic Signal Timing Request

Red Flash Request Form


Before submitting the forms, please review the
Traffic Frequently Asked Questions (FAQ).

Note:  Plan checks for traffic signals take up to 3 weeks.
Traffic signal timing requests take up to 1 month.

Public Works - Engineering
Traffic Engineering
311 Vernon Street
(916) 746-1300
(916) 746-1339 Fax
(916) 774-5220 TDD
trafficsignals@roseville.ca.us