Graphics Version
Logo

Homepage > ... > Specific Plan Projects > Creekview Specific Plan > Creekview Specific Plan Draft EIR

Creekview Specific Plan EIR


Creekview Specific Plan Final EIR
Section UL
-- Notice of Completion
_0 Table of Contents
_1.0 Introduction
_2.0 Project Description
_3.0 Summary
_4.01 Land Use and Agricultural Resources
_4.02 Population and Employment
_4.03 Transportation and Circulation
_4.04 Air Quality
_4.05 Climate Change
_4.06 Noise
_4.07 Geology, Soils, Seismicity
_4.08 Vegetation and Wildlife
_4.09 Cultural Resources
_4.10 Hazardous Materials and Public Safety
_4.11 Public Services
_4.12-1 Public Services - Water
_4.12-2 Public Services - Recycled Water
_4.12-3 Public Services - Wastewater
_4.12-4 Public Services - Solid Waste
_4.12-5 Public Services - Electric
_4.13 Hydrology
_4.14 Aesthetics and Visual Resources
_5.0 CEQA Considerations
_6.0 Alternatives
_7.0 Planning Considerations
_8.0 Acronyms
_9.0 Report Preparation
10.0 Intro and Text Changes to the Draft EIR
11.0 Responses to Comments
Draft EIR & Appendices
Section UL
1.0 Introduction
2.0 Project Description
3.0 Mitigation Summary
4.01 Land Use
4.02 Population
4.03 Traffic & Circulation
4.04 Air Quality
4.05 Climate Change
4.06 Noise
4.07 Geology
4.08 Vegetation & Wildlife
4.09 Cultural Resources
4.10 Hazardous Materials
4.11 Public Services
4.12-1 Water
4.12-2 Recycled Water
4.12-3 Wastewater
4.12-4 Solid Waste
4.12-5 Electricity & Natural Gas
4.13 Hydrology
4.14 Aesthetics
5.0 CEQA Considerations
6.0 Alternatives
7.0 Planning Considerations
8.0 Acronyms
9.0 Report Preparation
A - Notice of Preparation
B - Comments Received on the NOP
C - GMVC Recommendations
D - Traffic Analysis
E - Traffic Data
F - Air Quality Report
G - Sanitary Sewer Master Plan
H-1 - Water ASR Notice of Preparation
H-2 - Water Supply Assessment
H-2.1 - Water Demand Factors
H-2.2 - Potable Water Master Plan
H-2.3 - Water Conservation Plan
H-2.4 - Recycled Water Master Plan
H-2.5 - America River Hydrologic Record
H-2.6 - City of Roseville Water Supply Contracts
H-2.7 - Groundwater Impact Analysis for Proposed Reason Farms Land Retirement Plan
H-3 - Water Forum Agreement
H-4 - RBI Technical Memo
H-5 - WFA EIR Mitigation Measures
I - Merritt Smith Technical Memo
J - Wastewater Master Plan EIR Mitigation Measures
K - Noise Analysis
L - Policy Analyses
M - Master Drainage Study Creekview Bypass Channel
N - City of Roseville General Plan Policies
O - Placer County General Plan Policies
P - City/USFWS MOU
Q - Dry Utilities Report
R - Biological Resource Assessment
S - Vernal Pool Recovery Plan Information

SEARCH   

Homepage | Residents | Business | Visiting | Departments | e-Services | Apply | Find | Report | Sign Up
City of Roseville 311 Vernon St., Roseville, CA 95678. Phone: 916-774-5200.
Powered by Civica Software