Capital Improvement Program (CIP)


The City of Roseville Capital Improvement Program (CIP) identifies the various transportation improvements needed to serve the future transportation demands on the roadway system through the year 2020. The CIP is periodically updated to respond to changing conditions and to assure the development of an adequate transportation system, consistent with the City’s Level of Service (LOS) Policy. The City Council sets priorities for the construction of individual Capital Improvement Program projects throughout the City.

Captial Improvement Program (CIP) Documents

Download the entire Final Subsequent Environmental Impact Report for the 2020 Transporation Systems Capitol Improvement Program (1.77 MB)

EIR CIPDownload the entire Proposed Draft Subsequent Environmental Impact Report for the 2020 Transportation Systems Capitol Improvement Program (10.55 MB)

Scott Gandler, P.E.
Senior Civil Engineer in Charge

Development Services - Engineering
Transportation Planning
311 Vernon Street
(916) 774-5339
(916) 746-1339 Fax
(916) 774-5220 TDD
sgandler@roseville.ca.us